Instant Download HPE0-S59 Dumps Q&As Provide PDF&Test Engine [Q27-Q51]

0 Comments

Rate this post

Instant Download HPE0-S59 Dumps Q&As Provide PDF&Test Engine

Fast Exam Updates HPE0-S59 dumps with PDF Test Engine Practice

QUESTION 27
Your customer has 6 logical enclosures spanning 18 HPE Synergy frames. The customer needs to add one more logical enclosure based on 5 HPE Synergy frames How will this change impact the customer environment?

 
 
 
 

QUESTION 28
Your customer wants to add a second HPE Synergy frame to an existing logical enclosure Based on a single HPE Synergy frame. The customer wants to use a highly available master setup.
Which procedures should De performed during the expansion process? (Select two.)

 
 
 
 
 

QUESTION 29
Click the drop-down menu that will allow you to define the location of the master modules within the logical interconnect group.

QUESTION 30
Which compute node parameters are captured within server hardware type?

 
 
 
 

QUESTION 31
Which statement about HPE Apollo 2000 Gen10 Plus platform is true?

 
 
 
 

QUESTION 32
Refer to the exhibit.

Which statement about this logical interconnect group is true?

 
 
 
 

QUESTION 33
Your customer reports that they cannot deploy HPE Synergy compute nodes using HPE OneView for VMware vCenter Server (HPE OV4VC).
What should you check during troubleshooting process?

 
 
 
 

QUESTION 34
You are troubleshooting an HPE OneView server profile that presents a critical state. The server profile was configured with a Link Aggregation Group What should you check to fix the issue?

 
 
 
 

QUESTION 35
You are troubleshooting an HPE OneView server profile that presents a critical state. The server profile was configured with a Link Aggregation Group What should you check to fix the issue?

 
 
 
 

QUESTION 36
Match each HPE OneView network type with its definition.

QUESTION 37
Your customer wants to add a second HPE Synergy frame to an existing logical enclosure Based on a single HPE Synergy frame. The customer wants to use a highly available master setup.
Which procedures should De performed during the expansion process? (Select two.)

 
 
 
 
 

QUESTION 38
Match HPE SimpliVity term with the definition.

QUESTION 39
Your customer wants to compare HPE Superdome Flex with HPE Superdome Flex 280.
Which statement about these two systems is true?

 
 
 
 

QUESTION 40
Your customer manages an HPE Synergy platform using HPE OneView 5.6. To leverage new functionalities, the customer wants to update HPE OneView to version 61 Which statement about this update process is true?

 
 
 
 

QUESTION 41
After HPE Superdome Flex deployment and nPar setup, you need to verify health status of HPE Superdome Flex components.
Put the steps on the left into the coned order on the right to perform this task.

QUESTION 42
Your customer wants to add dedicated Fibre Channel connectivity to the HPE Synergy frame running HPE Synergy 480 Gen10 compute modules, each with one CPU socket populated Currently they use two 12 Gb SAS switches and two HPE Virtual Connect SE 100Gb F32 Modules for HPE Synergy installed in third fabric.
What must be done to enable dedicated FC connectivity for this HPE Synergy frame?

 
 
 
 

QUESTION 43
Your customer plans to deploy a VMware ESXi with HPE Synergy platform. They also plan a vSAN deployment leveraging HPE D3940 Storage Modules and SSD drives The customer requested the following components:
– HPE Synergy frame with ten HPE Synergy 480 Gen10 Plus compute modules
– Two HPE Virtual Connect SE 100Gb F32 Modules for Synergy
– An appropriate number of vSAN Standard licenses for each compute node
– One HPE O3940 Storage Module with 40 SSDs – All required cables and options Which statement about this request is true?

 
 
 
 

QUESTION 44
After deploying HPE Superdome Flex 280 you need to check Core Analysis Engine (CAE) Log.
Click the appropriate section in the HPE Superdome Flex 280 management interface that will allow you to complete this task.

QUESTION 45
Your customer has 6 logical enclosures spanning 18 HPE Synergy frames. The customer needs to add one more logical enclosure based on 5 HPE Synergy frames How will this change impact the customer environment?

 
 
 
 

QUESTION 46
An administrator tries to open iLO interlace from HPE OneView Instead of being automatically logged in a login prompt displays Where should you start the troubleshooting process?

 
 
 
 

QUESTION 47
After deploying HPE Superdome Flex 280 you need to check Core Analysis Engine (CAE) Log.
Click the appropriate section in the HPE Superdome Flex 280 management interface that will allow you to complete this task.

QUESTION 48
Your customer has an HPE Synergy frame equipped with a D3940 Storage Module. Each of the compute nodes has an appropriate storage controller Installed and two 12Gb SAS switches installed in the first fabric.
The customer reports that compute nodes cannot access the storage module. What should you verify first when troubleshooting this problem?

 
 
 
 

QUESTION 49
Your customer plans to deploy VMware ESXi 7. 0 U2, and they are looking for a hardware platform that will allow them to use up to 16 CPU sockets Which HPE compute system meets the customer requirements?

 
 
 
 

QUESTION 50
Your customer has an HPE Synergy platform deployed and managed using HPE OneView. The customer also has HPE Superdome Flex with RMC deployed They plan to deploy a second nPar and HPE Superdome Flex
280 They plan to manage new components using HPE OneView
What must be done to achieve this goal?

 
 
 
 

QUESTION 51
Click the option that will allow you to change the ESXI image used In an OS Deployment Plan.


Exam Valid Dumps with Instant Download Free Updates: https://www.vcedumps.com/HPE0-S59-examcollection.html


Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below