Verified 1z0-1077-22 dumps Q&As 100% Pass in First Attempt Guaranteed Updated Dump from VCEDumps [Q50-Q67]

0 Comments

5/5 - (2 votes)

Verified 1z0-1077-22 dumps Q&As 100% Pass in First Attempt Guaranteed Updated Dump from VCEDumps

Pass Order Management Cloud 1z0-1077-22 Exam With  86 Questions

Oracle 1z0-1077-22 Exam Syllabus Topics:

Topic Details
Topic 1
  • Create External Interface Routing Rules
  • Configure Order Transformation
Topic 2
  • Set up Oracle Transactional Business Intelligence (OTBI) Metrics
  • Change Management and Process Assignment
Topic 3
  • Explain Advance Order processing (Back to Back, ISO, DropShip)
  • Configure Change Management for Sales Orders
Topic 4
  • Create a Constraint Entity and a Processing Constraint (including Order Validation)
  • Manage Global Order Promising
Topic 5
  • Explain Common Inventory Configurations
  • Create a Multi-Channel User Interface
Topic 6
  • Processing Constraints and Hold Codes
  • Delete orders from interface tables
  • Manage Orchestration Processes

 

QUESTION 50
Which three statements are true about the Extensible Flexfields setup for order capture integration? (Choose three.)

 
 
 
 
 

QUESTION 51
The warehouse manager of your companywants manual intervention to handle the allocated materials and to backorder the sales order lines in case of any physical discrepancies in the stock before pick confirmation. The warehouse manager wants to enforce manual picking followed by auto ship confirmation based on the picked quantity without any further manual intervention.
What is the correct shipment configuration to meet this requirement?

 
 
 
 

QUESTION 52
Identify the task that the seeded Warehouse Operator role can perform.

 
 
 
 
 

QUESTION 53
Which action must be performed on the orchestration process user interface to activate an orchestration process after the order orchestration configurations are completed?

 
 
 
 

QUESTION 54
Your customer would like automatic e-mail notifications to be sent for specific business events. On the Manage Business Event Trigger Points page, which business event trigger points can be used to enable e-mail notifications?

 
 
 
 
 

QUESTION 55
Your customer wants to include externally managed manufacturing supplies in Global Order Promising results. What are the four steps that you perform to meet this requirement?

 
 
 
 
 

QUESTION 56
Your company is implementing Order Management Cloud tomanage the sales orders but fulfillment happens through third party logistics (3PL).
What process should be executed to communicate to the 3PL system that the sales orders are ready to pick release and ship?

 
 
 
 
 

QUESTION 57
A company manufactures and ships industrial water filters from its only factory unit in India. Which four types of lead time can the companyuse to create promising rules in lead-time promising mode? (Choose four.)

 
 
 
 
 
 
 

QUESTION 58
Yourcustomer requires changes be made to the Order Management work areas. The customer would like to rearrange the tab layout and hide attributes. Which statement is true about this requirement and customizations that an administrator will be able to make?

 
 
 
 
 

QUESTION 59
Which process requires the Process Supply Chain Orchestration Interface process to be executed manually so that a supply order gets created?

 
 
 
 
 

QUESTION 60
Which three statements are true about the Visual Information Builder interface? (Choose three.)

 
 
 
 
 
 

QUESTION 61
You are importing sales order data from a source system. You want to delete the imported sales orders from interface tables to save storage space. How would you do this?

 
 
 
 
 
 

QUESTION 62
Your company, which is a global major in farming equipment, has products ranging from make-to-stock fast moving items, assembled-on-demand items, and complex configurable items with manufacturing plants and distribution centers spread across the US, Europe, and China. The company is deploying Oracle Cloud Order Management, and wants to evaluate the different promising modes that are possible through cloud Global Order Promising for its products.
Which three promising modes are possible through GOP for the company’s products? (Choose three.)

 
 
 
 
 

QUESTION 63
Identify three ongoing maintenance tasks that a user is required to execute from the Order Management Work Area after the Order Management Implementation is completed. (Choose three.)

 
 
 
 
 

QUESTION 64
You are revising a sales order by manually scheduling the following fulfillment line andsplitting it.
Which three order attributes can be updated for the split line? (Choose three.)

 
 
 
 
 

QUESTION 65
You want to decrease the implementation time for Order Management by using the Quick Start feature. Select the accurate list of four areas that you can configure by using the Quick Start feature.

 
 
 
 
 

QUESTION 66
Which two statements describe Net Change Collection? (Choose two.)

 
 
 
 
 

QUESTION 67
What flow is depicted in the diagram below?

 
 
 
 
 

Pass 1z0-1077-22 Tests Engine pdf – All Free Dumps: https://www.vcedumps.com/1z0-1077-22-examcollection.html

Related Links: www.stes.tyc.edu.tw fortunetelleroracle.com telegra.ph www.stes.tyc.edu.tw www.stes.tyc.edu.tw www.stes.tyc.edu.tw


Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below